Cabin sides temp. installed to scibe lines
Viewed: 25 times.
|
Sides painted and re-installed
Viewed: 19 times.
|
set up to find the perfect ine
Viewed: 20 times.
|
Temp guide for saw
Viewed: 25 times.
|
Finally the cabin lines
Viewed: 20 times.
|
cap rail off
Viewed: 8 times.
|
Preping for one final coat on everything
Viewed: 18 times.
|
Teak covering bds. and beam carrier
Viewed: 20 times.
|
IMGP1825
Viewed: 12 times.
|